---
title: "Free CCAO-F Mock Exam, Timed, No Sign-up | Cred Farmer"
url: https://credfarmer.com/practice/ccao-f
description: "60 CCAO-F questions in a free 120-minute mock, no account needed. Sit it timed, quick or untimed, then get a score by domain and a reason for every option."
last_updated: 2026-10-29
publisher: "Cred Farmer, an independent study platform, not affiliated with or endorsed by Anthropic or Pearson VUE"
---

No account needed

# Free CCAO-F mock exam, timed, with a reason for every option

60 questions written for the Claude Certified Associate - Foundations blueprint, sat at the official pace of two minutes an item. No sign-up, nothing saved, nothing sent anywhere.

Want more? The post [CCAO-F worked scenarios](https://credfarmer.com/blog/ccao-f-practice-questions) works 10 more items option by option, and the [CCAO-F study guide](https://credfarmer.com/certifications/claude-certified-associate-foundations#questions) shows 6 more with their keys: 76 distinct items with this paper, none behind an account.

60 items · 120 minutes official · 720 to pass · No account

**The CCAO-F exam changes on 7 December 2026.** Pearson VUE says the CCAO-F exam includes updated content from 7 December 2026, and that the updated exam guide is published on 17 November 2026. This page follows Exam Guide v1.0 (July 2026), the guide to prepare from if you sit before 7 December 2026. If you sit on or after that date, prepare from the updated guide. We will compare it with v1.0 when it is published and update this page. [Pearson VUE's notice](https://www.pearsonvue.com/us/en/anthropic.html), read on 29 October 2026.

**60**Items in this mock

**120**Official minutes

**720**Scaled score to pass

**$99**Official exam fee

**7**Official domains

Question bank dated 2 October 2026. Checked against Exam Guide v1.0 (July 2026) on 17 September 2026.

Three ways to sit it

## Start the CCAO-F mock

Answer in this tab and get a raw score by domain with the key and the reason each option fails. Every mode scores the same way and shows the same review afterwards. The clock is the only difference, and it is the difference most candidates underestimate. Or work through the paper below one question at a time, checking each as you go.

### Full, timed

All 60 items in 120 minutes, two minutes an item, the official pace. The sitting submits itself when the clock reaches zero.

### Quick, timed

30 items drawn evenly across the 7 domains, in 60 minutes at the same pace. A different draw each time.

### Untimed review

Every item with no clock. Flag what you are unsure of, submit when you are done, and read the reasons.

## Filter the paper by domain

- [All domains 60](https://credfarmer.com/practice/ccao-f)
- [D1 Prompting and Task Execution 8](https://credfarmer.com/practice/ccao-f?domain=1)
- [D2 Output Evaluation and Validation 13](https://credfarmer.com/practice/ccao-f?domain=2)
- [D3 Product and Model Selection 7](https://credfarmer.com/practice/ccao-f?domain=3)
- [D4 Workflow Integration and Solution Design 10](https://credfarmer.com/practice/ccao-f?domain=4)
- [D5 Configuration and Knowledge Management 7](https://credfarmer.com/practice/ccao-f?domain=5)
- [D6 Governance, Risk, and Responsible Use 9](https://credfarmer.com/practice/ccao-f?domain=6)
- [D7 Troubleshooting and Optimization 6](https://credfarmer.com/practice/ccao-f?domain=7)

Answer as you read

## The CCAO-F paper: every question

60 items, each tagged with its official domain. Work through the paper one question at a time: pick an option to check it, or ask for the key, and read why each option holds or fails. Nothing is saved. For a scored sitting against the clock, use the start modes above.

Checked 0 of 60, 0 correct

[Sit it timed instead](https://credfarmer.com/practice/ccao-f#pp-start-heading)

1. Question 1 · Domain 1: Prompting and Task Execution · Single answer

   A claims handler's prompt produced a decline letter that cites a clause not in the customer's policy and reads like a legal brief. Which revision fixes both problems?

   Select the best answer.

   - A. Attach the policy, limit citations to it, and name a lay customer as the reader
   - B. Ask Claude to check its own clause numbers and simplify the letter
   - C. Ask for a warmer tone and a friendly close
   - D. Rerun the same prompt until a draft cites a real clause
2. Question 2 · Domain 1: Prompting and Task Execution · Single answer

   An analyst asked Claude in one request to extract clauses from forty contracts and rank them. Clauses got mixed up, and the ranking is untraceable. What should change?

   Select the best answer.

   - A. Repeat the request and tell Claude to be thorough and cite each clause
   - B. Extract each contract into a fixed table, check it, then rank
   - C. Ask for the ranking first and the extracts afterward
   - D. Upload the contracts to a Project and ask again
3. Question 3 · Domain 1: Prompting and Task Execution · Single answer

   You have asked Claude four times to make a road-closure notice clearer. Residents still call to ask the dates, which sit in paragraph three. What is the best next step?

   Select the best answer.

   - A. Ask again for a clearer notice and an explanation of each edit
   - B. Start a new chat and have Claude rewrite the notice from scratch
   - C. Name the failure and require the dates in the first line
   - D. Ask for five versions and let legal choose
4. Question 4 · Domain 1: Prompting and Task Execution · Single answer

   A manager uses one prompt, "Give me a thorough answer," for every task. It returned three near-identical seminar names and wrong totals from a table. What change fits both tasks?

   Select the best answer.

   - A. Keep the one prompt and add a line telling Claude to try harder
   - B. Have Claude answer both requests in the voice of a senior partner
   - C. Ask for one well-argued name, and a narrative summary in place of the totals
   - D. Request many varied names and state the calculation
5. Question 5 · Domain 1: Prompting and Task Execution · Single answer

   A category manager's prompt for a supplier negotiation brief returned generic text. Briefs must use that supplier's terms and never show internal margins. Which change fixes this?

   Select the best answer.

   - A. Ask Claude to write in the voice of a confident negotiator
   - B. Supply the supplier's current terms and state that margins must not appear
   - C. Ask for a longer brief covering every objection
   - D. Tell Claude to fill any missing terms with typical ones for the category
6. Question 6 · Domain 1: Prompting and Task Execution · Select 2

   One prompt asks Claude for defect rates, flagged suppliers, a narrative and corrective actions. The narrative named unflagged suppliers, and a director must approve actions. Which two changes fit best? (Select two.)

   Select exactly 2.**0/2 selected.**

   - A. Keep one request and number each step from calculation through to the actions
   - B. Calculate and flag first, then give the narrative only the checked table
   - C. Put the corrective actions first in the prompt
   - D. Have Claude reconcile narrative and table in one response
   - E. Stop after the flagged list for the director's approval
7. Question 7 · Domain 1: Prompting and Task Execution · Single answer

   All twelve pilot testers scored ten out of ten on a quiz Claude wrote about a hand-hygiene policy. The induction is tomorrow. What should the next prompt do?

   Select the best answer.

   - A. Ask for harder questions and rerun the pilot until the average looks right
   - B. Add two more answer options to every question
   - C. Give the pilot result and a target score, and ask for scenario questions
   - D. Attach the national guideline and ask for new questions
8. Question 8 · Domain 1: Prompting and Task Execution · Single answer

   A research office asked Claude about climate funding and got no sources and two funders nobody can find. The answer will decide which calls to pursue. What approach fits?

   Select the best answer.

   - A. Ask for every funder Claude knows and verify the top twenty by hand
   - B. Ask in three separate chats and keep funders that all three name
   - C. Have Claude draft the three applications now
   - D. Frame it as research, with a source and date for each funder
9. Question 9 · Domain 2: Output Evaluation and Validation · Single answer

   Claude turned a sixty-page audit report with twelve numbered findings into a one-page brief. You have verified nine findings, and the pack closes in thirty minutes. What should you do next?

   Select the best answer.

   - A. Confirm all twelve appear, then verify the other three
   - B. Read the brief twice for fluency and confirm it fits on one page
   - C. Ask Claude whether it covered all twelve findings and accept a yes
   - D. Send the brief to the head of audit for a full read-through before it goes in
10. Question 10 · Domain 2: Output Evaluation and Validation · Single answer

    A draft web page from Claude credits a 43 percent cut in onboarding time to a named analyst firm. You cannot find the figure anywhere. What should you do?

    Select the best answer.

    - A. Ask Claude for the report title and page number to complete the citation
    - B. Keep the figure and soften the credit to some analysts
    - C. Treat it as fabricated, remove it, and check every other figure in the draft
    - D. Keep the line if Claude rates its confidence high
11. Question 11 · Domain 2: Output Evaluation and Validation · Single answer

    Claude shortlisted twenty of two hundred applicants. Nineteen attended the same three universities, and only one is a woman, though women were 38 percent of applicants. What should happen next?

    Select the best answer.

    - A. Send it to the client, noting one standard was applied to all
    - B. Ask Claude to add women until the list matches the pool
    - C. Rerun the screen and keep the list if repeated
    - D. Hold the shortlist and find which criteria produced the skew
12. Question 12 · Domain 2: Output Evaluation and Validation · Single answer

    Claude drafted forty museum labels. Three dates differ by a decade or more from the accession register, the official record. What should the curator do before engraving?

    Select the best answer.

    - A. Check every date and maker against the register
    - B. Ask a second curator to read all forty labels for plausibility
    - C. Check only the dates Claude says it is unsure about
    - D. Compare each date with top web results
13. Question 13 · Domain 2: Output Evaluation and Validation · Single answer

    Claude calculated arrears percentages for twelve estates from a table you pasted. One shows 104 percent and two look wrong. The figures go to a regulator. What should you do?

    Select the best answer.

    - A. Recompute the three odd rows and accept the table if they are right
    - B. Recompute all twelve rows in a spreadsheet
    - C. Ask Claude to explain the 104 percent and keep it if the logic holds
    - D. Run the calculation again in a new chat and use the new figures
14. Question 14 · Domain 2: Output Evaluation and Validation · Single answer

    You have an hour, and one pharmacist is on shift. Claude drafted staff schedule emails and a customer leaflet on interactions between common medicines. Both read well. How should review be allocated?

    Select the best answer.

    - A. Review both drafts yourself for tone and typing errors
    - B. Ask Claude to double-check both, then send them
    - C. Have the pharmacist review both documents before release
    - D. Read the schedules yourself and have the pharmacist check the leaflet
15. Question 15 · Domain 2: Output Evaluation and Validation · Select 2

    Claude drafted a boil-water notice from the incident log, listing affected streets and a time when supply returns. You could publish it now. Which two facts call for qualified review first? (Select two.)

    Select exactly 2.**0/2 selected.**

    - A. A wrong street or time would harm residents, who cannot spot the error
    - B. It was drafted from the incident log, not from scratch
    - C. Claude stated the restoration time without hedging
    - D. The restoration time is a public commitment with legal consequences
    - E. The notice is short enough to read quickly
16. Question 16 · Domain 2: Output Evaluation and Validation · Single answer

    Claude wrote one 900-word release note. Field engineers need install and rollback steps, customers need what changed, and sales need a one-line benefit. What should you do?

    Select the best answer.

    - A. Create three versions from the same checked facts
    - B. Send the full note to everyone and let readers skip sections
    - C. Cut the note to 300 words for all readers
    - D. Let each team write its own version
17. Question 17 · Domain 2: Output Evaluation and Validation · Single answer

    Of two drafts of a fee-change letter, one reads warmly and the other is stiff but states the required fee, date and right to close. How should you proceed?

    Select the best answer.

    - A. Use the warm draft and have compliance add wording later
    - B. Polish the stiff draft without changing the facts
    - C. Merge the two by hand, picking the best paragraphs of each
    - D. Ask Claude which draft is better
18. Question 18 · Domain 2: Output Evaluation and Validation · Single answer

    Claude will analyze three thousand complaints. The data team must load categories and counts into a dashboard without retyping. Which output should you request?

    Select the best answer.

    - A. An inline summary of the main themes and rough shares
    - B. A formatted document artifact with a section per category
    - C. A CSV with one row per category and count
    - D. A slide artifact with one chart per category
19. Question 19 · Domain 2: Output Evaluation and Validation · Single answer

    You will revise a forty-page brand guide with Claude over several weeks, then export it for colleagues. Which output format fits best?

    Select the best answer.

    - A. A document artifact that is revised and then exported
    - B. A series of inline chat replies, one per section
    - C. A CSV file with one row per guideline
    - D. One long inline answer in the chat
20. Question 20 · Domain 2: Output Evaluation and Validation · Single answer

    A guest complaint raised five issues. Claude's draft reply covers three and offers "appropriate compensation" where the manager approved a set credit. What check matters most?

    Select the best answer.

    - A. Ask Claude to rate its empathy and revise until it scores nine of ten
    - B. Match each issue to the reply and state the approved credit
    - C. Make the reply as long as the complaint was
    - D. Confirm the first sentence is an apology
21. Question 21 · Domain 2: Output Evaluation and Validation · Single answer

    Claude's summary of an inspection report says the roof was replaced in 2019 and, in its risk section, that it keeps 1970s tiles. An underwriter will price from the summary. What should you do?

    Select the best answer.

    - A. Leave both statements in and let the underwriter resolve them
    - B. Ask Claude which statement is right and adopt its answer
    - C. Check both against the report and fix the summary
    - D. Delete the risk section's roof statement
22. Question 22 · Domain 3: Product and Model Selection · Single answer

    Every Monday you open a new chat, upload the same six background files, re-explain the client's conventions, then ask for that week's analysis. Which feature fits this pattern?

    Select the best answer.

    - A. One conversation kept open for the whole engagement
    - B. Research mode to rebuild the background each week
    - C. An artifact holding the context that you paste into each new chat
    - D. A Project with the files and conventions
23. Question 23 · Domain 3: Product and Model Selection · Single answer

    A team needs three uses: extracting five fields from 30,000 forms a month, a weekly summary from structured reports, and reasoning for contested appeals. Which model allocation fits?

    Select the best answer.

    - A. Sonnet for all three as a general-purpose middle ground
    - B. Haiku for the extraction, Sonnet for summaries, Opus for the appeals
    - C. Opus for all three, including the extraction
    - D. Opus for extraction and Haiku for the appeals
24. Question 24 · Domain 3: Product and Model Selection · Single answer

    Setting every request to the most capable model tripled the bill. Most requests reformat notes and emails, while planning-appeal drafts need deep reasoning. Which allocation is best?

    Select the best answer.

    - A. Move everything to a mid-tier model and prompt the appeals more carefully
    - B. Keep the most capable model for all requests
    - C. A lower-cost model for routine work, the top model for appeals
    - D. Let each person choose the model for each task
25. Question 25 · Domain 3: Product and Model Selection · Single answer

    After three hours and sixty exchanges in one chat, Claude has twice contradicted earlier decisions and dropped the agreed structure. Two days of drafting remain. What should you do?

    Select the best answer.

    - A. Stay in the chat and paste the decisions before each request
    - B. Switch to a more capable model within the same conversation
    - C. Start over with only the source files
    - D. Get a summary of decisions, verify it, then start fresh
26. Question 26 · Domain 3: Product and Model Selection · Single answer

    Before deciding whether to bid, a board needs a quick, sourced picture of a regional market the company has never served. Which Claude feature fits this task?

    Select the best answer.

    - A. Research mode, with sources cited
    - B. A plain chat drawing on general knowledge
    - C. An artifact built from the bid documents
    - D. A Project holding the company's past sales reports
27. Question 27 · Domain 3: Product and Model Selection · Single answer

    Each day a course lead re-enters the module structure, rubric and preferred tone before planning lessons. Colleagues will soon plan with the same rubric. Where should this context live?

    Select the best answer.

    - A. Rely on memory to carry it all
    - B. Keep pasting it at the start of each chat
    - C. A Project set up for the course team
    - D. Keep one chat open for the whole term
28. Question 28 · Domain 3: Product and Model Selection · Single answer

    Your team plans to move 5,000 templated acknowledgment replies a day to a faster, lower-cost model. What should happen before the switch?

    Select the best answer.

    - A. Switch all at once and review complaints after the first month
    - B. Ask the new model to grade its own replies
    - C. Stay on the current, more capable model
    - D. Test a sample of its replies against the template standard
29. Question 29 · Domain 4: Workflow Integration and Solution Design · Single answer

    Most of 340 monthly delivery complaints concern missed delivery windows, and nobody knows which stage causes them. You are asked to use Claude to fix this. What should come first?

    Select the best answer.

    - A. Build an assistant that answers each complaint within an hour
    - B. Have Claude sort the complaints by where delays begin
    - C. Use research mode to list fixes for late deliveries
    - D. Set a target of 30 percent fewer complaints
30. Question 30 · Domain 4: Workflow Integration and Solution Design · Select 2

    Planning officers spend 40 percent of their week summarizing applicants' documents and working out which consultations apply. By law, a qualified officer decides each application. Which two uses of Claude fit? (Select two.)

    Select exactly 2.**0/2 selected.**

    - A. Recommend approval or refusal on applications Claude judges straightforward
    - B. Send applicants a likely outcome based on past cases
    - C. Summarize each application into a brief with page references
    - D. Replace pre-application meetings with a chat tool
    - E. Draft a list of likely consultations for the officer to confirm
31. Question 31 · Domain 4: Workflow Integration and Solution Design · Single answer

    You must plan a move from twelve reading-list systems to one. Claude's first plan, from general knowledge, described vendor features that have since been withdrawn. How should you use Claude now?

    Select the best answer.

    - A. Keep asking from general knowledge but have it flag features it is unsure of
    - B. Ask for a blank template and research by hand
    - C. Give it current vendor documents as sources and list its assumptions
    - D. Have Claude pick the winning vendor in one long session
32. Question 32 · Domain 4: Workflow Integration and Solution Design · Single answer

    Returns take 6.2 days against a three-day target, and Claude's advice was generic. You have a process map with each step's time and owner. What should you do next?

    Select the best answer.

    - A. Ask Claude to design a new process without seeing the current one
    - B. Ask again in research mode for industry benchmarks on returns
    - C. Ask for a business case for new returns software
    - D. Give Claude the map and ask where waiting time builds up
33. Question 33 · Domain 4: Workflow Integration and Solution Design · Single answer

    Paralegals pick from 35 letter templates, and a lawyer signs each letter. Four percent get the wrong fee clause from a poor template choice. Where should Claude fit?

    Select the best answer.

    - A. At template selection, showing the fields it used
    - B. Replace the templates with letters Claude drafts in its own words
    - C. A weekly scan of sent letters for fee-clause errors
    - D. Redesign the intake form and leave drafting unchanged
34. Question 34 · Domain 4: Workflow Integration and Solution Design · Single answer

    A six-week pilot will have Claude draft the weekly non-conformance summary a plant manager uses to decide whether to stop a line. Which pilot design is sound?

    Select the best answer.

    - A. Release summaries Claude rates above 80 percent confidence
    - B. Expand to all plants once one summary is accepted
    - C. Set a baseline and have an engineer check each summary against the log
    - D. Drop the free-text fields from the log
35. Question 35 · Domain 4: Workflow Integration and Solution Design · Single answer

    A loan team can add Claude to one step this quarter: drafting 400 weekly "documents still required" letters, each read by a loan officer, or recommending declines, which policy reserves to underwriters. Which goes first?

    Select the best answer.

    - A. The decline recommendations, largest loans first
    - B. Both steps together this quarter
    - C. Neither until a full requirements study is signed off
    - D. The weekly letters on missing documents
36. Question 36 · Domain 4: Workflow Integration and Solution Design · Single answer

    A pilot on 200 claims cut reading time by 22 minutes per claim, but three summaries omitted an injury detail that changed the claim category. What should the executive slide say?

    Select the best answer.

    - A. The time saved, the three misses and the proposed review step
    - B. The yearly saving projected to all claims, with misses in an appendix
    - C. That the model's accuracy will improve with every claim it handles
    - D. The three misses and a call to halt rollout
37. Question 37 · Domain 4: Workflow Integration and Solution Design · Single answer

    A Project cut patient-leaflet drafting from four hours to forty minutes over 25 leaflets. Reviewers corrected dosage wording in two drafts before publication. Which statement belongs in the briefing?

    Select the best answer.

    - A. The Project checks its own medical facts before drafting
    - B. Every draft still needs clinician review
    - C. Departments can move to sampling one leaflet in five
    - D. The Project can also draft consent forms and discharge notes
38. Question 38 · Domain 4: Workflow Integration and Solution Design · Single answer

    Of 2,400 tickets, 55 percent are tasks a self-service portal already handles, 30 percent are how-to questions answered in the help center, and 15 percent are bugs needing investigation. Where should Claude start?

    Select the best answer.

    - A. Drafting replies for the portal tasks, the largest share
    - B. Summarizing the bug tickets for engineers
    - C. One reply assistant for all three types
    - D. Drafting how-to answers from the help center for agents to check
39. Question 39 · Domain 5: Configuration and Knowledge Management · Single answer

    A listings Project holds 140 past listings, the voice guide and years of sales reports. Some drafts quote old prices, which policy bans. What change fits best?

    Select the best answer.

    - A. Remove the sales reports and add a no-price instruction
    - B. Keep everything and add an instruction to ignore the sales reports
    - C. Split it into one Project per property type
    - D. Replace the files with a Google Drive connector
40. Question 40 · Domain 5: Configuration and Knowledge Management · Single answer

    Thirty recruiters will share a Project for candidate summaries. Earlier summaries varied in format and sometimes guessed a candidate's age, which policy forbids. What should the Project include?

    Select the best answer.

    - A. Each recruiter's own format preferences added to the instructions
    - B. Instructions setting one format and banning such inferences
    - C. Two years of past resumes as knowledge showing what a strong hire looks like
    - D. An instruction to rank candidates and name five
41. Question 41 · Domain 5: Configuration and Knowledge Management · Single answer

    Connecting Gmail would give Claude a whole mailbox of 90 clients' confidential mail. Policy limits each client's data to that client's work and does not cover connectors. What should you do?

    Select the best answer.

    - A. Connect it and tell Claude to read only the thread you name
    - B. Connect it and rely on Gmail labels to keep each client's mail separate
    - C. Get the policy owner's ruling before connecting
    - D. Rule out Claude for client email under every setup
42. Question 42 · Domain 5: Configuration and Knowledge Management · Single answer

    An HR Project still quotes the old parental leave entitlement. Its knowledge holds both the old and new policy files, with similar names and no dates. What should you do?

    Select the best answer.

    - A. Remove the old file and put the effective date in the new file's title
    - B. State the new entitlement as a fact in the instructions
    - C. Upload the new policy again under another name
    - D. Have staff check every leave answer by hand
43. Question 43 · Domain 5: Configuration and Knowledge Management · Single answer

    A Project's 1,800-word instruction has 45 rules, some in conflict, such as a 60-word limit and a 90-word required disclaimer. Outputs vary and staff correct most of them. What redesign is best?

    Select the best answer.

    - A. Keep all 45 rules in priority order and demand that each be followed exactly
    - B. Keep the few rules that always apply and say which wins in a conflict
    - C. Replace the written rules with twenty example messages
    - D. Split the setup into two Projects by message type
44. Question 44 · Domain 5: Configuration and Knowledge Management · Single answer

    You are writing the system-level instruction for a Project that drafts delay-compensation replies. Agents paste each claim file into their request. What belongs in the system-level instruction?

    Select the best answer.

    - A. The passenger's name, flight and delay for the current claim
    - B. A goal of clearing as many claims as possible without agent review
    - C. The rule that amounts come only from the uploaded schedule
    - D. A summary of rival airlines' policies
45. Question 45 · Domain 5: Configuration and Knowledge Management · Single answer

    Each week you paste the same tone guide and the term calendar into a new chat before drafting a newsletter. The calendar changes once a term. Which setup fits best?

    Select the best answer.

    - A. Keep fresh chats and paste both from a file
    - B. A Project for the guide, with the calendar pasted each week
    - C. A Project holding three years of past newsletters instead
    - D. A Project holding both, updated each term
46. Question 46 · Domain 6: Governance, Risk, and Responsible Use · Single answer

    A housing provider is reviewing four uses of Claude. Arrears cases can end in eviction, and policy requires a housing officer's documented assessment first. Which use should be declined?

    Select the best answer.

    - A. Drafting a newsletter from approved content for editing
    - B. Ranking tenants for eviction action by the tone of their emails
    - C. Sorting repairs by urgency for a supervisor to confirm
    - D. Translating notices, with a bilingual check
47. Question 47 · Domain 6: Governance, Risk, and Responsible Use · Select 2

    Claude would choose substitutes for out-of-stock medicines across 5,000 order lines a day. Which two facts about this task show it should not be automated? (Select two.)

    Select exactly 2.**0/2 selected.**

    - A. The volume is more than two pharmacists can review
    - B. A wrong substitute may be found only after a patient takes it
    - C. Only a pharmacist may approve a substitution
    - D. The pharmacists would need training to use Claude
    - E. Orders arrive as structured lines with product codes
48. Question 48 · Domain 6: Governance, Risk, and Responsible Use · Single answer

    To find why some payslips cause queries, an analyst has names, employee IDs, salaries and query text. Policy allows personal data only in anonymized, minimized form. What should be uploaded?

    Select the best answer.

    - A. The full dataset unchanged, kept inside the payroll office's own workspace
    - B. A sample with names removed but employee IDs kept
    - C. Query text and pay fields, with identifiers removed and salaries banded
    - D. Only the query text, leaving out every pay field
49. Question 49 · Domain 6: Governance, Risk, and Responsible Use · Single answer

    An adviser wants Claude to draft suitability reports from client meeting notes. The firm's enterprise Claude workspace is approved for client data, and regulators require advice records to be retained. Which approach fits?

    Select the best answer.

    - A. Use a personal account, with the client's name removed from the notes
    - B. Treat the enterprise chat history as the retained advice record
    - C. Keep Claude away from suitability reports entirely
    - D. Draft in the workspace, then file records in the advice system
50. Question 50 · Domain 6: Governance, Risk, and Responsible Use · Single answer

    Applicant records were collected under a notice covering admissions only. Marketing now wants to analyze them in the approved workspace. What should happen first?

    Select the best answer.

    - A. Consult the data protection officer
    - B. Proceed with the analysis in the approved workspace
    - C. Replace names with codes, then proceed with the analysis
    - D. Email past applicants for consent and use the replies
51. Question 51 · Domain 6: Governance, Risk, and Responsible Use · Single answer

    Your AI policy requires logging before work starts and review by a named owner, a day each. It is Monday, and a proposal is due Friday. What should you do?

    Select the best answer.

    - A. Draft now and log the use after the proposal is submitted
    - B. Write the proposal without Claude this week
    - C. Log it today, draft on Tuesday and Wednesday, and review on Thursday
    - D. Have Claude only edit a manual draft, with no log
52. Question 52 · Domain 6: Governance, Risk, and Responsible Use · Single answer

    A Project approved for drafting public notices from published documents now needs a connector to internal incident reports. The report owner agrees to grant access. What is required before adding it?

    Select the best answer.

    - A. Add the connector now, under the approval the Project already has
    - B. The Project owner's sign-off in the change log
    - C. A note to governance at the next quarterly review
    - D. A new governance review for the new data and purpose
53. Question 53 · Domain 6: Governance, Risk, and Responsible Use · Single answer

    HR wants Claude to score 3,000 applications against a job description to produce a shortlist. Which ethical question must be answered before the pilot starts?

    Select the best answer.

    - A. Whether proxies such as career gaps could disadvantage groups
    - B. Whether Claude, asked directly, confirms the criteria are fair to all groups
    - C. Whether all 3,000 applications can be scored before the season ends
    - D. Whether Claude should also send the rejections
54. Question 54 · Domain 6: Governance, Risk, and Responsible Use · Single answer

    Claude's donor letters add emotive details, like an illness or a quote, that are not in the consented case files. These letters raise more money. What is the ethical course?

    Select the best answer.

    - A. Keep the added details and track the extra money raised
    - B. Use only facts from the consented files
    - C. Keep the details but change names and places
    - D. Stop using Claude for donor letters altogether
55. Question 55 · Domain 7: Troubleshooting and Optimization · Single answer

    A Project quotes wrong prices in 15 of 100 answers despite three instruction rewrites. Its price list is a scanned image with no text layer. What should you do?

    Select the best answer.

    - A. Add a rule to quote the price list word for word
    - B. Move the Project to a more capable model
    - C. Split the scan into smaller PDFs by category
    - D. Replace the scan with a text file and recheck the error rate
56. Question 56 · Domain 7: Troubleshooting and Optimization · Single answer

    Three account managers get campaign briefs with different section orders, lengths and tone from the same Project. Its setup has not changed in months. What should you check first?

    Select the best answer.

    - A. Whether the instructions define order, length and tone
    - B. Whether moving to a larger model makes the format consistent
    - C. Whether deleting and rebuilding the Project helps
    - D. Which brief the managers rate highest
57. Question 57 · Domain 7: Troubleshooting and Optimization · Single answer

    Clients say reminder texts are too long. Adding "be concise" to the prompt changed nothing, and messages still average 110 words. What should the next change be?

    Select the best answer.

    - A. Ask Claude why the texts are long and apply its suggestions
    - B. Set a measurable limit and test it on past reminders
    - C. Add short examples and roll the change out to all clients
    - D. Switch to a faster model for shorter output
58. Question 58 · Domain 7: Troubleshooting and Optimization · Single answer

    After a discount line was added to sales emails, replies fell from 18 to 12 percent. The same weeks included a holiday and a competitor's launch. What is the best response?

    Select the best answer.

    - A. Remove the discount line today across every email
    - B. Keep the line and ask Claude for more persuasive emails
    - C. Run both versions on split sends
    - D. Use whichever version the sales team prefers
59. Question 59 · Domain 7: Troubleshooting and Optimization · Single answer

    Time per helpdesk ticket rose from six to seven minutes after Claude drafting began, because agents rewrite 30 percent of drafts, mostly on invoice tickets. Which optimization is best?

    Select the best answer.

    - A. Turn off drafting for invoice tickets and keep it for the rest
    - B. Drop agent review on the 70 percent of drafts sent unchanged
    - C. Move every ticket to a more capable model
    - D. Ask agents to send drafts with minor problems
60. Question 60 · Domain 7: Troubleshooting and Optimization · Select 2

    Each week an analyst pastes 40 interview transcripts into one chat and asks for themes. Later answers slow down and contradict earlier ones. The coding frame never changes. Which two changes fit best? (Select two.)

    Select exactly 2.**0/2 selected.**

    - A. Keep a single chat open all quarter and paste each week's transcripts into it
    - B. Process transcripts in batches, then combine the summaries in a fresh chat
    - C. Move every step to the most capable model
    - D. Keep the coding frame in a Project and start a new chat each week
    - E. Ask Claude to work faster at the top of the prompt

Before you ask

## Before you sit the mock

**Is this the real CCAO-F exam?**

No. Every item here was written for this page from the official CCAO-F Exam Guide and its published domains and objectives. Nothing is recalled from a sitting, nothing is drawn from another provider, and Cred Farmer is not affiliated with Anthropic or Pearson VUE. The items are short scenarios, about the length of the guide's sample questions. Of the 60, 55 are single-answer with four options and 5 ask you to select two of five, saying so in the stem. The questions themselves are ours, and their difficulty is not calibrated against the exam.

**How is the mock scored?**

You get the raw count of correct answers out of the items you sat, and the same count for each domain beside that domain's official weight. A select-two item counts only when both picks match the key. The exam reports a scaled score with a 720 cut, and no practice percentage converts to it, so this page never shows a scaled score, a pass verdict or a percentile.

**Do I need an account to take it?**

No. Choose a start mode and the sitting runs in your browser tab. There is no sign-up, no email field and no cookie that follows you. An account only matters if you want the larger signed-in library, and the link for that sits at the bottom of the page rather than in your way.

**Is it actually free, or is there a catch?**

No catch. Everything on Cred Farmer is free, this page included: no card, no trial, no limit on how many times you sit it. An account costs nothing either; it adds the five timed forms, saved progress and a readiness score capped by your first sitting of each form. The one limit here is inventory: the no-account paper is one paper, so sit it a second time and you will remember some items, and that is when the signed-in forms become the next step.

**How many questions are in the mock?**

60 in the full sitting, allocated across the 7 official domains in proportion to their weights. The clock runs at the official pace of 60 items in 120 minutes, two minutes an item, so the full sitting gets 120 minutes, the same as the exam. The quick sitting draws 30 of them evenly across the domains in 60 minutes, and the untimed review takes the whole paper without a clock.

**What happens to my result?**

It stays in this tab. Nothing is sent to a server, nothing is stored on your device, and nothing you answer here feeds a readiness score or any aggregate. Close or refresh the page and the result is gone, which is also why it is worth reading the per-option reasons before you leave.

## This page is 60 items. The account has 300.

Everything on Cred Farmer is free. An account adds the five timed forms, saved progress and a readiness score: CCAO-F has 5 forms aligned to the current blueprint, 60 items each, 300 in total, plus drills by objective, and your first sitting of each form sets the band the score can reach. No card, no trial clock.

[Create a free account for the five timed forms](https://credfarmer.com/start/ccao-f?to=practice)

Every item on this page was written for it from the official CCAO-F Exam Guide, not recalled from a sitting and not copied from anyone else's set. Material sold as recalled questions can cost you the credential: read [why Claude certification exam dumps are a bad bet](https://credfarmer.com/blog/claude-certification-exam-dumps). Items were last checked against the guide on 17 September 2026. The guide is published on Anthropic's [CCAO-F certification page](https://anthropic-partners.skilljar.com/claude-certified-associate-foundations-certification).

Not affiliated with, or endorsed by, Anthropic or Pearson VUE. Exam facts are summarised from publicly published program information and can change. Always confirm against the official exam guide before booking.
